Skip to main content
bkg element

Energy Sources

It doesn't matter as long as it is renewable

Finerge harnesses the energy of Nature where it is abundant.

Explore the map to learn more about each of the Energy Sources.

It doesn't matter as long as it is renewable
It doesn't matter as long as it is renewable

Our source of energy is nature.

It doesn't matter as long as it is renewable

Wind Farms

RAIA Over Powering

Start of operation
3-05-2024

No. of Wind Turbines
1

Installed Power
5.50 MW

Manufacturer
ENERCON

Model
E-160

FONTE DA MESA II Over Powering

Start of operation
28/05/2024

No. of Wind Turbines
1

Installed Power
1.80 MW

Manufacturer
ENERCON

Model
E-138

PINHEIRO Over Powering

Start of operation
19/04/2024

No. of Wind Turbines
1

Installed Power
4,20 MW

Manufacturer
VESTAS

Model
V150

PICOS VALE DO CHÃO Over Powering

Start of operation
12/04/2024

No. of Wind Turbines
1

Installed Power
4,50MW

Manufacturer
VESTAS

Model
V150

LINTE 1

Start of operation
2024

No. of Wind Turbines
7

Installed Power
23.10MW

Manufacturer
GE

Model
GE137

SAN MARCOS

Start of operation
2024

No. of Wind Turbines
2

Installed Power
6.00MW

Manufacturer
GE

Model
GE137

Jenáriz

Start of operation
2024

No. of Wind Turbines
6

Installed Power
24.00MW

Manufacturer
GE

Model
GE137

Cabril OP

Start of operation
2024

No. of Wind Turbines
1

Installed Power
4.00MW

Manufacturer
Enercon

Model
E-138

Gevancas II OP

Start of operation
2024

No. of Wind Turbines
1

Installed Power
2.10MW

Manufacturer
Enercon

Model
E-138

MEROICINHA 2

Start of operation
2011

No. of Wind Turbines
6

Installed Power
15,79MW

Manufacturer
Nordex

Model
N90

ALTO DO MARCO Over Powering

Start of operation
2022

No. of Wind Turbines
1

Installed Power
2,20 MW

Manufacturer
VESTAS

Model
V120-MK11C

LOMBA DO VALE Over Powering

Start of operation
2022

No. of Wind Turbines
1

Installed Power
4,20 MW

Manufacturer
VESTAS

Model
V150

ALVIÁZERE Over Powering

Start of operation
2022

No. of Wind Turbines
1

Installed Power
3,60 MW

Manufacturer
VESTAS

Model
V136-MK33

DOURO SUL Over Powering

Start of operation
2023

No. of Wind Turbines
7

Installed Power
29,40 MW

Manufacturer
VESTAS

Model
V150

LAGOA DOM JOÃO Over Powering

Start of operation
2023

No. of Wind Turbines
1

Installed Power
5,80 MW

Manufacturer
LDJF-OP

Model
GE 5.5

AZINHEIRA Over Powering

Start of operation
2022

No. of Wind Turbines
1

Installed Power
2,20 MW

Manufacturer
VESTAS

Model
V120-MK11C

SÃO PAIO Over Powering

Start of operation
2022

No. of Wind Turbines
1

Installed Power
2,15 MW

Manufacturer
VESTAS

Model
V120-MK11C

TOUTIÇO Over Powering

Start of operation
2023

No. of Wind Turbines
4

Installed Power
20,40 MW

Manufacturer
TOU-OP

Model
GE5.5

CAPUCHA Over Powering

Start of operation
2022

No. of Wind Turbines
1

Installed Power
2 MW

Manufacturer
VESTAS

Model
V120-MK11C

ALTO MINHO Over Powering

Start of operation
2023

No. of Wind Turbines
5

Installed Power
28,60 MW

Manufacturer
MDR-OP2/ PCS-OP2

Model
GE 5.5

ARGOMIL-MOURO

Start of operation
2021

No. of Wind Turbines
11

Installed Power
46,20MW

Manufacturer
VESTAS

Model
V117-4.2

GALO RAINHA

Start of operation
2021

No. of Wind Turbines
11

Installed Power
46,20MW

Manufacturer
VESTAS

Model
V117-4.2

ARGA Over Powering

Start of operation
2022

No. of Wind Turbines
1

Installed Power
2,20 MW

Manufacturer
VESTAS

Model
V120-MK11C

TOCHA II

Start of operation
2021

No. of Wind Turbines
9

Installed Power
32,85 MW

Manufacturer
SIEMENS GAMESA

Model
SG 3.4-132

VIGIA

Start of operation
2018

No. of Wind Turbines
8

Installed Power
28,8 MW

Manufacturer
SENVION

Model
3.6M114

PENACOVA

Start of operation
2019

No. of Wind Turbines
13

Installed Power
46,80

Manufacturer
SENVION

Model
3.6M114

MAUNÇA

Start of operation
2018

No. of Wind Turbines
10

Installed Power
20,50 MW

Manufacturer
SENVION

Model
MM92

Santo António

No. of Wind Turbines
16

Installed Power
32MW

Manufacturer
Enercon

Picoto

No. of Wind Turbines
27

Installed Power
56,4MW

Manufacturer
Enercon

Picos

No. of Wind Turbines
26

Installed Power
52MW

Manufacturer
Enercon

Mendoiro

No. of Wind Turbines
26

Installed Power
52MW

Manufacturer
Enercon

Alto Corisco

No. of Wind Turbines
35

Installed Power
70,6MW

Manufacturer
Enercon

Arada OP2

Start of operation
2017

No. of Wind Turbines
5

Installed Power
11,75MW

Cabria

Start of operation
2016

No. of Wind Turbines
4

Installed Power
9.2MW

Trapa

Start of operation
2009

No. of Wind Turbines
10

Installed Power
20MW

Manhouce

Start of operation
2009

No. of Wind Turbines
15

Installed Power
30MW

Carvalhosa

Start of operation
2009

No. of Wind Turbines
17

Installed Power
34MW

Picão

Start of operation
2009

No. of Wind Turbines
11

Installed Power
22MW

Manufacturer
ENERCON

Model
E82

Aveloso

Start of operation
2009

No. of Wind Turbines
3

Installed Power
6MW

S. Pedro

Start of operation
2006+2015

No. of Wind Turbines
6

Installed Power
12MW

Pinheiro

Start of operation
2002

No. of Wind Turbines
12

Installed Power
21,6MW

Cabril

Start of operation
2002

No. of Wind Turbines
11

Installed Power
20,2MW

Serra da Amêndoa

Start of operation
Outubro 2002

No. of Wind Turbines
14

Installed Power
19,4MW

Manufacturer
Neg Micon

Model
NM52

Annual Energy Produced
44447MWh

Number of Inhabitants
9457

CO2 emissions avoided
24790ton

Serra da Laje

Start of operation
2021

No. of Wind Turbines
1

Installed Power
4,2MW

Manufacturer
Vestas

Model
V150

Annual Energy Produced
12384MWh

Number of Inhabitants
2635

CO2 emissions avoided
6907ton

Alto do Coto

Start of operation
Setembro 2003

No. of Wind Turbines
5

Installed Power
4,2MW

Manufacturer
Neg Micon

Model
NM52

Annual Energy Produced
9185MWh

Number of Inhabitants
1954

CO2 emissions avoided
5123ton

Baião

Start of operation
2009

No. of Wind Turbines
3

Installed Power
6,3MW

Manufacturer
Suzlon

Annual Energy Produced
14,9GWh

Number of Inhabitants
3154

CO2 emissions avoided
8272

Toutiço

Start of operation
2009

No. of Wind Turbines
34

Installed Power
102MW

Manufacturer
Vestas

Annual Energy Produced
217,8 GWh

Number of Inhabitants
45750

CO2 emissions avoided
120007

Lomba do Vale

Start of operation
2010

No. of Wind Turbines
9

Installed Power
21,10 MW

Manufacturer
Nordex

Annual Energy Produced
53,3 GWh

Number of Inhabitants
11188

CO2 emissions avoided
29348

Vila Franca de Xira

Start of operation
2009

No. of Wind Turbines
6

Installed Power
12,6MW

Manufacturer
Suzlon

Annual Energy Produced
36,1 GWh

Number of Inhabitants
7600

CO2 emissions avoided
19934

Coladillo

Start of operation
2010

No. of Wind Turbines
17

Installed Power
30,6MW

Manufacturer
Vestas

Annual Energy Produced
77,98 GWh

Number of Inhabitants
16382

CO2 emissions avoided
43303 ton

El Rincón

Start of operation
2010

No. of Wind Turbines
4

Installed Power
8MW

Manufacturer
Vestas

Annual Energy Produced
17,43 GWh

Number of Inhabitants
3662

CO2 emissions avoided
9680 ton

Coll de Moro

Start of operation
2012

No. of Wind Turbines
20

Installed Power
50MW

Manufacturer
GE

Annual Energy Produced
138,65GWh

Number of Inhabitants
29128

CO2 emissions avoided
76998 ton

Cabeza Mesá

Start of operation
2010

No. of Wind Turbines
15

Installed Power
29,6MW

Manufacturer
Vestas

Annual Energy Produced
62,24 GWh

Number of Inhabitants
13076

CO2 emissions avoided
34565 ton

Bon Vent de Corberá

Start of operation
2010

No. of Wind Turbines
22

Installed Power
49,2MW

Manufacturer
Vestas

Annual Energy Produced
125,8GWh

Number of Inhabitants
26429

CO2 emissions avoided
69862

Torre Madrina

Start of operation
2011

No. of Wind Turbines
20

Installed Power
50MW

Manufacturer
GE

Annual Energy Produced
152,30GWh

Number of Inhabitants
31997

CO2 emissions avoided
84580 ton

Vilalba dels Arcs

Start of operation
2010

No. of Wind Turbines
10

Installed Power
25MW

Manufacturer
GE

Annual Energy Produced
79,73GWh

Number of Inhabitants
16751

CO2 emissions avoided
44279

Aguieira

Start of operation
2003

No. of Wind Turbines
1

Installed Power
0,6 MW

Manufacturer
Enercon

Model
E-44

Annual Energy Produced
1.3 GWh

Number of Inhabitants
279

CO2 emissions avoided
733 ton

Alfarrobeira

Start of operation
2005

No. of Wind Turbines
1

Installed Power
0.6 MW

Manufacturer
Enercon

Model
E-48

Annual Energy Produced
1.2 GWh

Number of Inhabitants
250

CO2 emissions avoided
657 ton

Almargem

Start of operation
2007

No. of Wind Turbines
3

Installed Power
6 MW

Manufacturer
Enercon

Model
E-82/E1

Annual Energy Produced
18,5 GWh

Number of Inhabitants
3890

CO2 emissions avoided
10204 ton

Alto Corisco

Start of operation
2010

No. of Wind Turbines
35

Installed Power
70,6 MW

Manufacturer
Enercon

Model
5 E-7028 E-82/E12 E-92

Annual Energy Produced
146 GWh

Number of Inhabitants
112 014,8

CO2 emissions avoided
56 338,7 t

Alto da Vaca

Start of operation
2002

No. of Wind Turbines
4

Installed Power
2,4 MW

Manufacturer
Enercon

Model
E-44

Annual Energy Produced
5,7 GWh

Number of Inhabitants
1205

CO2 emissions avoided
3162 ton

Alto do Marco

Start of operation
2011

No. of Wind Turbines
6

Installed Power
12 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
34,3 GWh

Number of Inhabitants
7214

CO2 emissions avoided
18922 ton

Alvaiázere e Arega

Start of operation
2010

No. of Wind Turbines
9

Installed Power
18 MW

Manufacturer
Enercon

Model
7 E-82/E1 2 E82/E82-E2

Annual Energy Produced
56,6 GWh

Number of Inhabitants
11 900

CO2 emissions avoided
31214 ton

Arcipreste

Start of operation
2003

No. of Wind Turbines
1

Installed Power
0,6 MW

Manufacturer
Enercon

Model
E-44

Annual Energy Produced
1,2 GWh

Number of Inhabitants
262

CO2 emissions avoided
686 ton

Arga

Start of operation
2006

No. of Wind Turbines
15

Installed Power
40,6 MW

Manufacturer
Vestas/Enercon

Model
12-V90/2-E92

Annual Energy Produced
95,4 GWh

Number of Inhabitants
20 040

CO2 emissions avoided
52 566 ton

Armamar I

Start of operation
2010

No. of Wind Turbines
15

Installed Power
32,4 MW

Manufacturer
Enercon

Model
7 E-82/E1 8 E-82/E2

Annual Energy Produced
57,4 GWh

Number of Inhabitants
12 050

CO2 emissions avoided
31 608 ton

Armamar II

Start of operation
2015

No. of Wind Turbines
5

Installed Power
11,5 MW

Manufacturer
Enercon

Model
E-92

Annual Energy Produced
23,2 GWh

Number of Inhabitants
4 858

CO2 emissions avoided
12 742 ton

Azinheira

Start of operation
2007

No. of Wind Turbines
7

Installed Power
14 MW

Manufacturer
Enercon

Model
E-82/E1

Annual Energy Produced
27,2 GWh

Number of Inhabitants
5 709

CO2 emissions avoided
14976 ton

Benespera

Start of operation
2011

No. of Wind Turbines
17

Installed Power
39,1 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
85,1 GWh

Number of Inhabitants
17 874

CO2 emissions avoided
46 885 ton

Capucha

Start of operation
2005

No. of Wind Turbines
5

Installed Power
10 MW

Manufacturer
Enercon

Model
E-70

Annual Energy Produced
21,3 GWh

Number of Inhabitants
4444

CO2 emissions avoided
11656 ton

Chavães

Start of operation
2011

No. of Wind Turbines
15

Installed Power
34,5 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
67,6 GWh

Number of Inhabitants
14 198

CO2 emissions avoided
37 244 ton

Espiga

Start of operation
2006

No. of Wind Turbines
3

Installed Power
6 MW

Manufacturer
Enercon

Model
E-70

Annual Energy Produced
14,7 GWh

Number of Inhabitants
3087

CO2 emissions avoided
8 098 ton

Fonte da Mesa II

Start of operation
2010

No. of Wind Turbines
5

Installed Power
10 MW

Manufacturer
Enercon

Model
E-82/E1

Annual Energy Produced
29,1GWh

Number of Inhabitants
6120

CO2 emissions avoided
16 052 ton

Gevancas II

Start of operation
2013

No. of Wind Turbines
5

Installed Power
11,5 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
30,5 GWh

Number of Inhabitants
6403

CO2 emissions avoided
16 796 ton

Lagoa D. João e Feirão

Start of operation
2008

No. of Wind Turbines
17

Installed Power
34 MW

Manufacturer
Enercon

Model
E-82/E1

Annual Energy Produced
89,9 GWh

Number of Inhabitants
18877

CO2 emissions avoided
49 517 ton

Lourinhã I

Start of operation
2013

No. of Wind Turbines
9

Installed Power
20,7 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
48,9 GWh

Number of Inhabitants
10271

CO2 emissions avoided
26 942 ton

Lourinhã II

Start of operation
2011

No. of Wind Turbines
9

Installed Power
20,7 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
53,3 GWh

Number of Inhabitants
11 193

CO2 emissions avoided
29 360 ton

Mendoiro

Start of operation
2010

No. of Wind Turbines
26

Installed Power
52 MW

Manufacturer
Enercon

Model
13 E-7013 E-82/E1

Annual Energy Produced
115,1 GWh

Number of Inhabitants
88 362,3

CO2 emissions avoided
44 442,5 t

Moimenta

Start of operation
2016

No. of Wind Turbines
42

Installed Power
86,1 MW

Manufacturer
Senvion

Model
MM92

Annual Energy Produced
206,5 GWh

Number of Inhabitants
43 383

CO2 emissions avoided
113 798 ton

Moinho Velho

Start of operation
2004

No. of Wind Turbines
1

Installed Power
1,8 MW

Manufacturer
Enercon

Model
E-66/20.70

Annual Energy Produced
4,3 GWh

Number of Inhabitants
900

CO2 emissions avoided
2362 ton

Picos

Start of operation
2010

No. of Wind Turbines
26

Installed Power
52 MW

Manufacturer
Enercon

Model
11 E-7015 E-82/E1

Annual Energy Produced
129,4 GWh

Number of Inhabitants
99 281,1

CO2 emissions avoided
49 934,2 t

Picos Vale do Chão

Start of operation
2015

No. of Wind Turbines
11

Installed Power
22,55 MW

Manufacturer
Senvion

Model
MM92

Annual Energy Produced
76,8 GWh

Number of Inhabitants
16 139

CO2 emissions avoided
42 334 ton

Picoto

Start of operation
2010

No. of Wind Turbines
27

Installed Power
56,4 MW

Manufacturer
Enercon

Model
14 E705 E-82/E18 E-92

Annual Energy Produced
134,5 GWh

Number of Inhabitants
103 238,1

CO2 emissions avoided
51 924,4 t

Pousafoles

Start of operation
2011

No. of Wind Turbines
14

Installed Power
32,2 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
64,5 GWh

Number of Inhabitants
13 560

CO2 emissions avoided
35 570 ton

Ranhados

Start of operation
2010

No. of Wind Turbines
5

Installed Power
11,5 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
21,7 GWh

Number of Inhabitants
16 653,9

CO2 emissions avoided
8 376,2 t

S. Cornélio e Troviscal

Start of operation
2011

No. of Wind Turbines
25

Installed Power
57,5 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
122,4 GWh

Number of Inhabitants
25 724

CO2 emissions avoided
67 476 ton

Sampaio

Start of operation
2011

No. of Wind Turbines
10

Installed Power
23 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
73,6 GWh

Number of Inhabitants
15 462

CO2 emissions avoided
40 559 ton

Santo António

Start of operation
2010

No. of Wind Turbines
16

Installed Power
32 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
62GWh

Number of Inhabitants
47 602,6

CO2 emissions avoided
23942,1 t

São Paio

Start of operation
2006

No. of Wind Turbines
5

Installed Power
10 MW

Manufacturer
Enercon

Model
E-70

Annual Energy Produced
22,3 GWh

Number of Inhabitants
4676

CO2 emissions avoided
12 266 ton

Sendim

Start of operation
2011

No. of Wind Turbines
20

Installed Power
46 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
80,4 GWh

Number of Inhabitants
16 880

CO2 emissions avoided
44 279 ton

Sernancelhe

Start of operation
2016

No. of Wind Turbines
12

Installed Power
24 MW

Manufacturer
Senvion

Model
MM100

Annual Energy Produced
70,1 GWh

Number of Inhabitants
14 720

CO2 emissions avoided
38 612 ton

Serra da Nave

Start of operation
2011

No. of Wind Turbines
19

Installed Power
43,7 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
93,6 GWh

Number of Inhabitants
19 666

CO2 emissions avoided
51 587 ton

Sicó

Start of operation
2008

No. of Wind Turbines
10

Installed Power
20 MW

Manufacturer
Enercon

Model
E-82/E1

Annual Energy Produced
52,2 GWh

Number of Inhabitants
10964

CO2 emissions avoided
28 760 ton

Testos II

Start of operation
2011

No. of Wind Turbines
22

Installed Power
50,6 MW

Manufacturer
Enercon

Model
E-82/E2

Annual Energy Produced
99,7 GWh

Number of Inhabitants
20 945

CO2 emissions avoided
54 942 ton

Três Marcos

Start of operation
2016

No. of Wind Turbines
19

Installed Power
38,95 MW

Manufacturer
Senvion

Model
MM92

Annual Energy Produced
100,9 GWh

Number of Inhabitants
21 207

CO2 emissions avoided
55 629 ton

Videira

Start of operation
2005

No. of Wind Turbines
3

Installed Power
6 MW

Manufacturer
Enercon

Model
E-70

Annual Energy Produced
15,4 GWh

Number of Inhabitants
3239

CO2 emissions avoided
8495 t

Solar Farms

Sado

Start of operation
2021

Installed Power
14,97 MWp

Manufacturer
Siemens

Annual Energy Produced
30 GWh

Number of Inhabitants
6383

CO2 emissions avoided
17 Kton

Tejo Rei

Start of operation
2013

Installed Power
2,2MWp

Annual Energy Produced
3835MWh

Number of Inhabitants
806

CO2 emissions avoided
2130

Malhapão

Start of operation
2013

Installed Power
2,2MWp

Annual Energy Produced
3985MWh

Number of Inhabitants
787

CO2 emissions avoided
2081

Acil I

Start of operation
2013

Installed Power
2,2MWp

Annual Energy Produced
3857MWh

Number of Inhabitants
810

CO2 emissions avoided
2142

Acil II

Start of operation
2013

Installed Power
2,2MWp

Annual Energy Produced
3817MWh

Number of Inhabitants
802

CO2 emissions avoided
2120

Canha

Start of operation
2013

Installed Power
6,7MWp

Annual Energy Produced
11357MWh

Number of Inhabitants
2386

CO2 emissions avoided
6307

Montemor-o-Novo

Start of operation
2013

Installed Power
2,2MWp

Annual Energy Produced
3985MWh

Number of Inhabitants
810

CO2 emissions avoided
2213

Apra A

Start of operation
2014

Installed Power
4.57 MWp

Annual Energy Produced
7300 MWh

Number of Inhabitants
1534

CO2 emissions avoided
4023 ton

Apra B

Start of operation
2013

Installed Power
6.73 MWp

Annual Energy Produced
11000 MWh

Number of Inhabitants
2311

CO2 emissions avoided
6062 ton

Seixal

Start of operation
2015

Installed Power
8.9 MWp

Annual Energy Produced
14400 MWh

Number of Inhabitants
3025

CO2 emissions avoided
7935 ton

Coruche

Start of operation
2014

Installed Power
9.61 MWp

Annual Energy Produced
15100 MWh

Number of Inhabitants
3172

CO2 emissions avoided
8321 ton

Los Brocheros

Start of operation
2008

Installed Power
0.7 MWp

Annual Energy Produced
1100 MWh

Number of Inhabitants
231

CO2 emissions avoided
606 ton

Ledesma

Start of operation
2008

Installed Power
1.0 MWp

Annual Energy Produced
1400 MWh

Number of Inhabitants
294

CO2 emissions avoided
772 ton

Carbajosa la Sagrada

Start of operation
2008

Installed Power
2.0 MWp

Annual Energy Produced
3600 MWh

Number of Inhabitants
756

CO2 emissions avoided
1984 ton

Casariche

Start of operation
2008

Installed Power
1.94 MWp

Annual Energy Produced
3400 MWh

Number of Inhabitants
714

CO2 emissions avoided
1874 ton

Zahariche

Start of operation
2008

Installed Power
0.44 MWp

Annual Energy Produced
800 MWh

Number of Inhabitants
609

CO2 emissions avoided
441 ton

Cartaya

Start of operation
2008

Installed Power
2.12 MWp

Annual Energy Produced
2900 MWh

Number of Inhabitants
609

CO2 emissions avoided
1598 ton